Project Overview
Blending together existing buildings with new, purpose-built, state-of-the-art facilities, the Xavier College “Scope 3” development delivered an impressive transformation. This project converted the existing single-storey library into a new Staff Centre, and redeveloped the existing single court gymnasium into a multi-purpose auditorium, including new foyer and refurbished change rooms.
ElectraSol met a program of works focused around times that would have minimal impact on the school’s schedule. The project team was responsible for direct collaboration with the client, architects, engineers, material suppliers and specialist contractors to deliver the transformation.
The completed development provides Xavier College with two brand new facilities, which deliver an architectural statement in the school’s main entry and unique point of difference via an exciting purpose-built auditorium space.
ElectraSol was contracted to deliver this Project Through a competitive Tender Process. The electrical installation included installation of a new Consumers mains and Submains Cabling, cable tray support systems, switchboards, general and feature lighting, lighting control, power, communications, access control, CCTV and MATV.
Details
Client: Sarah Constructions
Location: Gawler, South Australia
Duration: Jan 2019—Nov 2019
Value: $389k